CAFM Implementation

Facility management that works from day one, with every asset already in the system.

Handover is where good data usually dies. Asset lists end up in spreadsheets, O&M manuals in boxes, and the FM team starts from scratch.

We set up your CAFM system from the BIM model and project data. Assets, locations, warranties and maintenance plans are loaded and linked before the keys change hands. We build LOD 500 asset information models and extract the asset register and COBie data, so nothing is lost at handover.

What we deliver

Asset register

every maintainable asset captured with location, attributes and documents

COBie extraction

Structured handover data pulled straight from the model

CAFM configuration

System set up around your sites, buildings, floors and spaces

Data migration

Legacy spreadsheets and records cleaned and loaded

Data migration

Legacy spreadsheets and records cleaned and loaded

Planned maintenance set-up

PPM schedules linked to every asset

Space management

Room data, areas and occupancy, ready to use

Asset information layouts

FM drawings and layouts extracted from the model

Training

Your FM team trained to run it

What we cover

New buildings at handover

Existing buildings and portfolios

Campuses, districts and giga-projects

Sports, leisure and public venues

How we work

Define

FM needs, asset classification and data requirements agreed

Capture

Data gathered from models, O&M manuals and site surveys

Validate

Data checked, gaps found and filled

Configure

CAFM set up and data loaded

Train

FM teams trained on daily workflows

Support

Help through go-live and beyond

Why TXG for CAFM Implementation

We knowaBIM experts first when a model lies

We know where the asset data lives in the model, and how to get it out clean.

Proven at handover

LOD 500 asset models, asset registers and COBie delivered on large public venues.

Ready for Digital Twin

Your CAFM data becomes the base for a live twin when you’re ready.