Bill of Quantities (BOQ) & Schedules

Quantities pulled from the model, measured the way your contract needs them, and traceable to every element.

Cost certainty starts with quantities you can defend. Manual take-offs from 2D drawings are slow, and one missed layer can sink a tender.

We extract quantities straight from BIM models or build the model first when there isn’t one. Then we structure them to the agreed method of measurement and hand over a BOQ that ties back to the design, line by line.

What we deliver

Model-based quantity take-off

Quantities extracted directly from Revit, Tekla and IFC models

BOQ preparation

To NRM2, POMI, CESMM4, SMM7 or your own format

2D take-off

When there’s no model, from PDF and DWG drawings

Material take-offs

Steel tonnage, rebar, concrete, MEP and façade quantities for procurement

5D BIM

Cost data linked to model elements, so quantities update as the design changes

Change quantification

What moved between revisions, measured and reported

Measurement mark-ups

Color-coded drawings and model views showing exactly what was measured

What we cover

Civil and structural works

Architecture and finishes

MEP services

Façade and envelope

Infrastructure and external works

How we work

Audit the model

We check it’s fit for quantities first: missing elements, wrong categories, duplicates

Map

Elements mapped to the measurement standard and classification

Extract

Quantities pulled from the model, with 2D take-off filling any gaps

Validate

Cross-checked against drawings and spot-measured

Format

BOQ issued in your template, with mark-ups for traceability

Update

Re-measured as revisions come through, with changes flagged

Why TXG for Bill of Quantities (BOQ) & Schedules

We know when a model lies

We’re BIM specialists first, so we catch the modelling errors that quietly distort a BOQ.

Traceable to the element

Every line in the BOQ links back to something you can see in the model.

Fast re-measure

Design changes are re-quantified in days, not weeks.